Huntley Station Industrial Waterfront Revitalization

Description

Master Plan that would transform an abandoned coal power plant into a vibrant, multi-use waterfront development that would attract big-name employers, small businesses, a diverse mix of residents, and visitors from far and wide to the site.

Five Primary Objectives:

  1. Preserve Industrial Heritage
  2. Connect the Riverside
  3. Connect the adjacent residential
  4. Two Grids
  5. Walkability, Bike-ability

Key Site Features Include:

  • New Mixed Use Buildings (super-block concept)
  • Office Space
  • Rec Center
  • Green Energy
  • Re-purposed Coal Plant
  • Retail Boardwalk Area
  • Canal
  • Elevated Rail Park
  • Outdoor Amphitheater
  • Boardwalk
  • Beach Area
  • Park Area
  • Marina

Services

Project Category