Runway at Lake City Gateway Airport
Client
City of Lake CityLocation
Lake City, FLTotal Cost
$6.5 MDescription
Rehabilitation of the 170-feet wide by 8,000 feet primary runway at Lake City Gateway Airport. Project included numerous components including bituminous pavement rehabilitation and a reconstruction and strengthening of the runway involving re-profiling the entire runway length. Runway Safety Area grading at Runway 10, including new storm sewer crossing and pipe lining of existing drainage network. Paved shoulder rehabilitation, new edge lighting and signage, blast pad reconstruction, runway marking, ditch cleaning, and grading.
The project included substantial coordination with airport tenants, the contractor and an aggressive five-phase construction safety phasing plan. The project was completed on time and under budget.
Awards
Asphalt Contractors Association of Florida Excellence in Pavement Special Project Award
Client Quote
“I am so proud to see all members of the project team, including Anderson-Columbia, the control tower, HAECO and the airport tenants, and the staff of Passero Associates working so well together to make this project such an outstanding success for the City.” -Roland Luster, Airport Director, Lake City Gateway Airport