Whole Foods Plaza Traffic Impact Study

Whole Foods Plaza Site Plan Passero provided Engneering Services
Whole Foods Plaza Site Plan
Whole Foods Plaza Completed Site Passero provided engineering serivces
Whole Foods Plaza Completed Site

Client

Daniele Family Companies

Location

Pittsford, NY

Description

The Whole Foods development required an extensive traffic impact study that encompassed 14 intersections including the I-590 ramp intersections with NYS Route 31. Each intersection was evaluated in detail to determine project impacts and appropriate mitigation. Intersection observations revealed that one study intersection was not operating consistently or correctly due to a malfunctioning signal controller. This observation lead to NYSDOT correcting the deficiency and improving travel along the corridor prior to construction of the project. Ultimately the study recommended adding two new traffic signals to the existing coordinated system as mitigation for project impacts. The analysis included timing and coordination plans for three peak time periods. Ms. Dake also designed the two new signals for the Whole Foods driveways, including pedestrian accommodations.